Webster Pride

Demolition of 9 Portables, Site Grading, Paving and Asphalt: General Contractor
5-OUSD-Webster-pride-bay-area-school-construction.jpg

Tang Center UC Berkeley

This project required extra precaution and attention to safety. The clinic was fully operational with medical staff and patients. We worked on the third floor so bringing in material safely and quietly was essential. We were able to finish this project on time and within budget.
7-tang-center-uc-berkeley-school-construction-bay-area.jpg

OUSD Madison Elementary

This project had a tight, fast paced summer schedule. It required a lot of teamwork. MAR CON Co. worked closely with sub-contractors to get 3 new portables installed along with their associated utilities, safely while working around summer school children. We exceeded our client’s expectations by delivering the project within budget and ahead of schedule.
2-OUSD-madison-school-construction-portables.jpg

Kaiser Permanente PTC Flooring

MAR CON Co. worked together with Koslo Corp. on a full lobby remodel at Kaiser Pleasanton’s Tech Center “Lobby B”. The time frame was tight but we were able to finish on time and within budget. Specialty Process: Poured in place cemetitious floor Cementitious exposed Poured on structural slab
5-KP-PTC-Lobby-B-new-flooring-install.jpg

Kaiser Permanente Broadway Medical Office Remodel

Medical stations, corridors, restrooms, and exam rooms remodeled by our general contractors
1kaiser-broadway-medical-office-remodel-framing.jpg